PlatformIndustriesStandardsPricingResources
Sign inCreate your workspace

The quality and operations platform for asset-intensive industries. QMS and ERP. One audit-ready backbone.

Product

  • Platform
  • Pricing
  • Resources
  • Documentation
  • Partners
  • Contact

Domains

  • Quality and compliance
  • Health, safety and environment
  • Manufacturing and operations
  • Lean and performance
  • Projects
  • Supply chain and warehouse
  • Sales and customers
  • Finance
  • People
  • Management and governance

Industries

  • Oil & Gas
  • Fabrication & Manufacturing
  • Coating & Painting
  • Civil & Construction
  • TPI Agencies

Standards

  • ISO 9001 · 14001 · 45001
  • IATF 16949 · VDA 6.3
  • ASME
  • SAES / AGES · NORSOK
  • ZATCA · PINT AE
  • Peppol BIS 3.0

© 2026 Enspekt. All rights reserved.

PrivacyTermsTrust and securityLinkedIn (opens in a new tab)
  1. Features
  2. Drawing Take-off

Enspekt Drawing Take-off

From the drawing to the material list.

Upload isometrics and P&IDs as PDF or DXF, CAD or scanned. Enspekt Drawing Reader reads every sheet on Enspekt’s own servers in the EU, and the rows land in the project’s take-off with the sheet they came from.

Create your workspaceRead the brochure
  • PDF and DXF, CAD output, plots and scans
  • 500 sheets read a month, more in monthly packs
  • Released lines become purchase requests

Why Drawing Take-off

Count the material once, from the source.

A take-off typed from drawings by hand is slow and hard to check. Here each sheet is read on its own, every row keeps its drawing and sheet number, rows the reader was unsure of are marked for review, and your piping classes fill in what a drawing does not print.

Every row traceable

Drawing number, sheet and line come with each row, so a quantity can be checked against the sheet it was read from.

Reviewed before it counts

Rows arrive as drafts; uncertain text from a scan is flagged, and nothing is added until the reviewer imports it.

Straight to purchasing

Released lines are requisitioned as purchase requests, and the project keeps a priced estimate of the take-off.

What’s included

Drawing Take-off: one module, everything below

  • Enspekt Drawing Reader

    Reads material tables from PDF and DXF sheets, text from scans and plotted lettering, one sheet at a time. Nothing is sent to an outside service.

  • Piping classes

    Your classes (A1A, CS 150# and so on) supply wall, material and standard by size range; a class can be drafted from the drawings that use it.

  • Commodities

    Each purchasable item once, linked to your item master, so every take-off line of it can be bought.

  • DXF block maps

    Name what each CAD block means once, and the blocks placed in a DXF become take-off rows next to its table.

  • Tag register

    Instrument, valve and equipment tags read from P&IDs go into the project’s tag register, each tag once.

  • Spreadsheet and PCF import

    A template for take-offs kept elsewhere, and PCF files from your piping design tool.

  • Estimate and RFQ

    Price the take-off for a project estimate, and draft requests for quotation by package straight from it.

  • Sheets included

    500 sheets read a month, CAD or scanned. Packs of 500, 2,000 or 5,000 more sheets a month can be added from Settings.

How it works

From an upload to a purchase request.

  1. 01

    Upload

    PDF or DXF, up to 200 sheets

  2. 02

    Read

    Sheet by sheet, in the EU

  3. 03

    Review

    Marked rows checked

  4. 04

    Complete

    Classes fill the gaps

  5. 05

    Release

    Quantities frozen

  6. 06

    Requisition

    Purchase requests

Sheet by sheet

A many-sheet file is read one sheet at a time, so a sheet that cannot be read does not hold up the others.

A clear monthly allowance

Members see how many sheets are left before they upload; a drawing larger than what is left is not read, never charged extra.

Granted per member

Seeing a project does not show its take-off: Drawing Take-off is granted on its own, and its prices with it.

Lines with a state

Draft, released and requisitioned: a released line is frozen, and only a draft can be deleted.

Your drawings stay with you

Read on Enspekt’s own servers in the EU; the files are stored with the project like any other document.

Help Center guide

How to upload, review, complete with classes, release and requisition, and what a sheet allowance counts.

Built forPiping engineerEstimatorProject engineerBuyer

Works with the rest of Enspekt.

The take-off sits inside a project and hands its material to purchasing.

  • Supply Chain

    Released lines become purchase requests, and requests go out for quotation and on to purchase orders.

  • Warehouse

    Commodities are items of your item master, so what is bought for a project is received and stocked like any other item.

  • Management & Governance

    Every take-off belongs to a project in Projects Basic, which comes with every bundle.

Cover of the Enspekt Drawing Take-off brochure

Take Drawing Take-off to your team

Everything on this page as a 4-page brochure to share with the people who run it.

PDF · 4 pages · 1.1 MB · November 2026 edition

View brochureDownload PDF

More Enspekt bundles

  • Quality
  • Manufacturing
  • Compliance
  • Lean
  • HSE
  • KPI & Performance
  • HR & Payroll
  • Recruitment
  • Maintenance
  • Field Service
  • Sales & CRM
  • Customer Experience
  • Helpdesk
  • Minutes of Meeting
  • Agent Access
  • Supply Chain
  • Warehouse
  • Equipment Rental
  • Projects Advanced
  • Feasibility Studies
  • Accounting
  • All bundles

Ready to see Enspekt in your workflow?

Oil & Gas, Manufacturing, Coating, Civil, TPI Agencies — set up a workspace with your own standards and sign-off workflows, across quality, operations, supply chain and finance.

Create your workspace

No credit card required · Every workspace is reviewed before activation